Power load cycle using GUIDE MATLAB GUI
  The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].
We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files
Zitieren als
Tamir Suliman (2025). Power load cycle using GUIDE MATLAB GUI (https://de.mathworks.com/matlabcentral/fileexchange/39624-power-load-cycle-using-guide-matlab-gui), MATLAB Central File Exchange. Abgerufen.
Kompatibilität der MATLAB-Version
Plattform-Kompatibilität
Windows macOS LinuxKategorien
Tags
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!Live Editor erkunden
Erstellen Sie Skripte mit Code, Ausgabe und formatiertem Text in einem einzigen ausführbaren Dokument.
loadcycle/
| Version | Veröffentlicht | Versionshinweise | |
|---|---|---|---|
| 1.0.0.0 |