I tried to do a remain sum using matlab and graph it,
why is my sumvec vector is 101? should the while loop runs from 10 to 100
%equ = sqrt(x+1)
% calculating remain sum of sqrt(x+1) from with 10 to 100 sub interval
sum = 0
sumvec = []
for n = 10:100
sum = 0
width = (3 - 0)/n
for c = 0:n
base = width * c
height = sqrt(base+1)
sum = sum + (width * height)
end
sumvec(n+1) = sum
end
figure;
i = 0:101
scatter(i,sumvec)

1 Kommentar

"why is my sumvec vector is 101? should the while loop runs from 10 to 100"
When n==100, which element do you expect this indexing to refer to?:
sumvec(n+1) = ..
Important: do NOT call any variable sum, as this shadows the very important inbuilt sum function.

Melden Sie sich an, um zu kommentieren.

 Akzeptierte Antwort

Setsuna Yuuki.
Setsuna Yuuki. am 21 Nov. 2020
Bearbeitet: Setsuna Yuuki. am 22 Nov. 2020

0 Stimmen

Because the values are saved from space 11 onwards.
You must change n+1 in sumvec()
n+1 = 11 -- n-9 = 1
sum = 0
sumvec = []
for n = 10:100
sum = 0;
width = (3 - 0)/n;
for c = 0:n
base = width * c;
height = sqrt(base+1);
sum = sum + (width * height);
end
sumvec(n-9) = sum; %% change n+1 -- n-9
end
figure;
i = 1:length(sumvec) %i vector
scatter(i,sumvec)

Weitere Antworten (0)

Kategorien

Mehr zu Food Sciences finden Sie in Hilfe-Center und File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by