Increment dates using for loop

10 Ansichten (letzte 30 Tage)
CM
CM am 9 Feb. 2019
Beantwortet: Stephen23 am 9 Feb. 2019
I'm trying to fill a variable sized datetime array. I then want the declared datetime value to fill the first 3 elements before incrementing by one to fill the next three.This process repeats until the desired sized element is reach. See current output & desired output.
Code:
samples = input("Number of Samples to Generate: ");
DateBuilt = repmat(datetime(0,0,0),samples,1);
t = datetime(2018,1,1);
DateBuilt(1) = t
for i=1:samples
if i <= 3
DateBuilt(i) = t;
else
t = t + 1;
DateBuilt(i) = t;
end
Current Output:
Number of Samples to Generate: 14
DateBuilt =
14×1 datetime array
01-Jan-2018
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
30-Nov--0001
Desired Output:
Number of Samples to Generate: 14
DateBuilt =
14×1 datetime array
01-Jan-2018
01-Jan-2018
01-Jan-2018
02-Jan-2018
02-Jan-2018
02-Jan-2018
03-Jan-2018
03-Jan-2018
03-Jan-2018
04-Jan-2018
04-Jan-2018
04-Jan-2018
05-Jan-2018
05-Jan-2018
  5 Kommentare
madhan ravi
madhan ravi am 9 Feb. 2019
Bearbeitet: madhan ravi am 9 Feb. 2019
Why in your desired output the last date has only repeated twice , any reason for it?
CM
CM am 9 Feb. 2019
Yes. The user input (*see “samples“ variable in code) determines the number of elements in the datetime array. The first element of array is filled with a datetime. The loop then continues to fill the 2nd and 3rd elements before incrementing by 1 day. the loop then proceeds to fill the 4th, 5th, and 6th elements before incrementing again and repeating the process for the next three elements This continues until the user defined size is reached. Repeating the last date only twice is my attempt to show that the loop stops based on an arbitrary number entered by the user.

Melden Sie sich an, um zu kommentieren.

Akzeptierte Antwort

Eric Sofen
Eric Sofen am 9 Feb. 2019
Are there any other calculations being done in the loop body of your actual code? If not, this can be done without looping:
samples = input("Number of Samples to Generate: ");
days = floor((0:samples-1)./3)'+1;
dt = datetime(2018,1,days);
If you do really need to loop for some other reason, there are things that need to change in your code:
1) It's missing and end to the conditional block.
2) t = t+1 ends up incrementing the day every iteration.
samples = input("Number of Samples to Generate: ");
DateBuilt = repmat(datetime(0,0,0),samples,1);
t = datetime(2018,1,1);
DateBuilt(1) = t;
for i=1:samples
DateBuilt(i) = t+days(floor((i-1)/3));
end

Weitere Antworten (1)

Stephen23
Stephen23 am 9 Feb. 2019
>> D = datetime('01-Jan-2018');
>> N = 14;
>> G = 3;
>> V = D + caldays(0:ceil(N/G)-1).';
>> V = repelem(V,G);
>> V = V(1:N)
V =
01-Jan-2018
01-Jan-2018
01-Jan-2018
02-Jan-2018
02-Jan-2018
02-Jan-2018
03-Jan-2018
03-Jan-2018
03-Jan-2018
04-Jan-2018
04-Jan-2018
04-Jan-2018
05-Jan-2018
05-Jan-2018

Kategorien

Mehr zu Loops and Conditional Statements finden Sie in Help Center und File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by