Info

Diese Frage ist geschlossen. Öffnen Sie sie erneut, um sie zu bearbeiten oder zu beantworten.

Data Transfer Settings Between Concurrent Tasks

1 Ansicht (letzte 30 Tage)
Gorkem
Gorkem am 27 Mär. 2018
Geschlossen: MATLAB Answer Bot am 20 Aug. 2021
I don't understand the difference between Ensure deterministic transfer (maximum delay) and Ensure deterministic transfer (minimum delay).
One with maximum delay is said to 'Create opportunity for parallelism', whereas minimum delay one is said to enforce 'Enforce data dependency.'.
Can someone elaborate on this?
In my application, I'm defining 4 tasks which I hope to be assigned to different cores on my 4 core target machine.
task #1 is for hardware abstraction and runs at 4 khz.
task #2 is for signal processing/estimation and runs at 1 khz.
task #3 is for what I call behavior and generates desired trajectories for the controls (task #4) at 500 hz.
task #4 is for controls running at 1 khz.

Antworten (0)

Diese Frage ist geschlossen.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by