Filter löschen
Filter löschen

Why the sum is different to real data?

1 Ansicht (letzte 30 Tage)
Tony Castillo
Tony Castillo am 10 Mai 2017
Kommentiert: Jan am 13 Mai 2017
Hi I have a doubt about, how matlab SUM values, maybe is quite easy for you answer this, but I have an issue based on the following: 1-I have real data about Power Consumption in a Buiding and in average that facility consumes 1740.48 e3 kW per day 2-I load the above data in my simulation based in Photovoltaic generation and I ran it for a day (3600seconds*24hours) 3-I extract the IL(intensity consumed by load) and VL (voltage on the load) from blocks "to file", I apply a simply multiplication 4-In order to find out the consumption during that period of time (24 hours), I apply the function "sum(PL)" and I receive a very large value, that is very uncomprehensible because is around of GW, when it should be kW per day. For me is hard to accept that value, that's why I give up to find an answer to that, please give me a hand in order to get the right value.
  4 Kommentare
Jayaram Theegala
Jayaram Theegala am 12 Mai 2017
Also, can you attach a sample MATLAB script that shows the issue you are facing?
Jan
Jan am 13 Mai 2017
The results are not "bad", but only unexpected. You can be sure, that Matlab calculates the sum exactly. This means, that your expectations do not match the data. Did you see KL's comment?

Melden Sie sich an, um zu kommentieren.

Antworten (0)

Kategorien

Mehr zu MATLAB finden Sie in Help Center und File Exchange

Produkte

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by