Multi-unit production planning with continuous variables
This submission can be used to evaluate the performance of optimization techniques on problems with large number of continuous variables. This optimization problem arises for maximization of Profit in Production Planning. However these files can be used as black-box optimization problems.
There are eight minimization optimization problems in this suite (case1.p, case2.p, case3.p, case4.p, case5.p, case6.p, case7.p and cas8.p).
Each of them has the following format
[ F, XCorrected] = case1(X);
Input: population (or solution, denoted by X) and its
Output: (i) the corrected population (denoted by XCorrected), and
(ii) the objective function value of the corrected population members (F). X is corrected to XCorrected as most algorithms fail to satisfy the complex constraints and XCorrected is not worse to X.
The file ProblemDetails.p can be used to determine the lower and upper bounds along with the function handle for each of the cases.
The format is [lb,ub,fobj] = ProblemDetails(ca);
Input: ca is an integer from 1 to 8.
Output: (i) the lower bound (lb),
(ii) the upper bound (ub), and
(iii) function handle (fobj).
The file Script.m shows how to use these files along with an optimization algorithm (SanitizedTLBO).
Case 1, Case 2, Case 5 and Case 6 have a problem dimension of 1287 continuous variables whereas
Case 3, Case 4, Case 7 and Case 8 have a problem dimension of 2624 continuous variables.
Note:
(i) The inbuilt optimization algorithms in MATLAB require that the objective function file return only the values of the objective function and cannot be directly used to solve these problems.
(ii) Conventionally, the algorithm provides X and requires F. But in these problems, in addition to F, XCorrected is provided by the objective function file.
(iii) The current best known solutions (rounded to two decimals), using computational intelligence algorithms, are
Case 1: -683.03; Case 2: -820.49; Case 3: -1024.56; Case 4: -1292.25
Case 5: -714.29; Case 6: -823.65; Case 7: -1118.28; Case 8: -1420.48
(iv) Case 1 - 4 have the same problem structure but employ different data; Case 5 - 8 has same set of data as compared to Case 1 - 4, but do not employ a certain feature (flexible) of the problem.
(v) The objective function files are capable of determining the objective function values of multiple solutions (i.e., if required, the entire population can be sent to the objective function file).
Reference : Sandeep Singh Chauhan, Prakash Kotecha,An efficient multi-unit production planning strategy based on continuous variables, Applied Soft Computing,2018,ISSN 1568-4946,
https://doi.org/10.1016/j.asoc.2018.03.012.
Zitieren als
SKS Labs (2024). Multi-unit production planning with continuous variables (https://github.com/SKSLAB/Multi-unit-production-planning-with-continuous-variables), GitHub. Abgerufen.
Kompatibilität der MATLAB-Version
Plattform-Kompatibilität
Windows macOS LinuxKategorien
- Mathematics and Optimization > Optimization Toolbox > Problem-Based Optimization Setup >
- Engineering > Industrial Engineering > Production Planning >
Tags
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!Live Editor erkunden
Erstellen Sie Skripte mit Code, Ausgabe und formatiertem Text in einem einzigen ausführbaren Dokument.
Versionen, die den GitHub-Standardzweig verwenden, können nicht heruntergeladen werden
Version | Veröffentlicht | Versionshinweise | |
---|---|---|---|
1.2.0.0 | Updated description. |
|
|
1.1.0.0 | Updated description and file. |
|
|
1.0.0.0 |