Wireless Ad-hoc Network Delay Analysis and Visualization
Version 1.0 (1,94 KB) von
Ardavan Rahimian
This code simulates delay in a wireless ad-hoc network with the interplay between Physical and Data link layers.
The code simulates a wireless ad-hoc network, considering the effects of transmission delay, queueing delay, and propagation delay on packet transmission between nodes. The code sets parameters for the simulation, creates random node positions within an area, and calculates distance, adjacency, and delay matrices. It then simulates packet transmission between nodes, computes delays, and visualizes the network and delays between nodes on a graph.
Zitieren als
Ardavan Rahimian (2026). Wireless Ad-hoc Network Delay Analysis and Visualization (https://de.mathworks.com/matlabcentral/fileexchange/128854-wireless-ad-hoc-network-delay-analysis-and-visualization), MATLAB Central File Exchange. Abgerufen.
Kompatibilität der MATLAB-Version
Erstellt mit
R2023a
Kompatibel mit allen Versionen
Plattform-Kompatibilität
Windows macOS LinuxTags
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!Live Editor erkunden
Erstellen Sie Skripte mit Code, Ausgabe und formatiertem Text in einem einzigen ausführbaren Dokument.
| Version | Veröffentlicht | Versionshinweise | |
|---|---|---|---|
| 1.0 |
