How to change order for different filters?

8 Ansichten (letzte 30 Tage)
Giggs B.
Giggs B. am 7 Jul. 2021
Kommentiert: Star Strider am 9 Jul. 2021
Hi,
I have 2 questions:
[y2,fs]=audioread('room.mp3');
y_h2=highpass(y2,1000,fs);
n=filtord(y_h2);
  • I have an audio file and I am doing signal processing over that audio file such a passing it though various filters. But I wanted to change order of those filters at my own will. How can I do that?
Thanks.

Akzeptierte Antwort

Star Strider
Star Strider am 7 Jul. 2021
Those functions have a second output, the digitalFilter object. Return that and all the information you want about the type of filter and the order will be available.
Example —
s = rand(1, 5000);
Fs = 1000;
fpass = 50;
[sfilt,df] = lowpass(s, fpass, Fs, 'ImpulseResponse','iir');
df
df =
digitalFilter with properties: Coefficients: [3×6 double] Specifications: FrequencyResponse: 'lowpass' ImpulseResponse: 'iir' SampleRate: 1000 PassbandRipple: 0.1000 StopbandAttenuation: 60 PassbandFrequency: 50 StopbandFrequency: 120.6500 DesignMethod: 'ellip' Use fvtool to visualize filter Use designfilt to edit filter Use filter to filter data
.
  12 Kommentare
Giggs B.
Giggs B. am 9 Jul. 2021
Got it, I was able to use the filters this way. Thanks :)
Star Strider
Star Strider am 9 Jul. 2021
As always, my pleasure!
.

Melden Sie sich an, um zu kommentieren.

Weitere Antworten (0)

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by