How do I run parallel bloomberg blp timeseries?

Hi, I am trying to get multiple intraday securities from bloomberg and noticed that the runtime is extremely long(each timeseries takes about 10-20 seconds). Is there away to run the blp timeseries in parallel to save time since it will take an hour just to run 100-200 securities?
Sample of my code. %Declare ProductList Array
% Grab data (Run timeseries in parallel)
[Data_Trade] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Trade');
[Data_Bid] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Bid');
[Data_Ask] = timeseries(blp,Product1,{floor(now)-90,floor(now)-1},5,'Ask'); %end parallel computing
%%Run data calculations
Thanks

Antworten (1)

Shashank Prasanna
Shashank Prasanna am 18 Jul. 2013

0 Stimmen

There is no way for me to test this out since I don't have blp connection, but if you have the parallel computing toolbox, try doing the above in a parfor loop. Have the 'Trade', 'Bid' etc in a variable which can be indexed with the loop variable.

3 Kommentare

Jon
Jon am 19 Jul. 2013
thanks. will try it out!
Jon
Jon am 19 Jul. 2013
Tried using spmd with 3 matlab pool workers but getting an error.
TypeTrade = {'Bid','Ask','Trade'};
spmd
a = timeseries(c,Product1,{floor(now)-60,floor(now)-1},5,char(TypeTrade(labindex)));
b = timeseries(c,Product1,{floor(now)-60,floor(now)-1},5,char(TypeTrade(labindex)));
c = timeseries(c,Product1,{floor(now)-60,floor(now)-1},5,char(TypeTrade(labindex)));
end
Error msges(Invalid Property Name)
1) for lab 1,2,3.. Warning: Element(s) of class 'blp' do not match the current constructor definition. The element(s) have been converted to structures.

Melden Sie sich an, um zu kommentieren.

Kategorien

Mehr zu Startup and Shutdown finden Sie in Hilfe-Center und File Exchange

Gefragt:

Jon
am 18 Jul. 2013

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by