What's wrong whith my schedule ?

clear all;
close all;
clc;
E=0;
while E~=0,2
Io=45.4746;
I=(2*Io)+4;
E=(I-Io)/Io;
G=(Io+E);
Io=G;
end

Antworten (1)

Les Beckham
Les Beckham am 23 Apr. 2021

0 Stimmen

There are several things wrong with this code.
First
while E~=0,2
is not valid Matlab syntax. Replace the , with a . if you mean to test for 0.2 (i.e., 1/5).
Second, you are resetting Io at the beginning of each loop so you will get the same results on every pass through the loop. Move the line
Io=45.4746;
above the while loop.
Third, this algorithm (if you move the initialization of Io outside the loop), converges to 1.0 and will never reach 0.2. So, you have an infinite loop.

Kategorien

Mehr zu MATLAB finden Sie in Hilfe-Center und File Exchange

Produkte

Version

R2021a

Tags

Gefragt:

am 23 Apr. 2021

Beantwortet:

am 23 Apr. 2021

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by