Minimize Time Optimization Algorithm

16 Ansichten (letzte 30 Tage)
Alara Duman
Alara Duman am 30 Mär. 2021
Hi,
From our home at
(0, 0), we go to point (10, 10) taking minimal time. There are three land. The area
A= {(x, y) : 2< x < 6, y ∈ R} where we can move with speed of 2 km/h.
Then, second area is
B = {(x, y) : 6≤ x ≤ 8, y ∈ R}
in secon area speed at 1 km/h. All other area is C, where we can proceed at 8 km/h.
Formalize the underlying optimization problem, variables and constraints, give a suitable objective function such as time. Which algorithm can I use?
Best regards.