Fix problem with NarX network
1 Ansicht (letzte 30 Tage)
Ältere Kommentare anzeigen
Very good, could rise as a snapshot or to explain the problem presented to me?. I made a prediction closeloop NarX, ie inputs have introduced today and given me the values of tomorrow. The problem is that when I look at the diagram in the original outputs (I do it for comparing the outputs with the outputs predicted original) gives me the answer 2 steps later. That is, if the original data make me a peak in January, I predicted outputs do in 3. I've thought about making remove delay, but I have a problem with the command since I required preparets arrays of inputs and targets of the same size after applying tonndata and I have the same dimensions as if tomorrow I get the targets, which now I have no inputs are the morning and therefore would not identical arrays. How I can solve the problem? thank you very much
0 Kommentare
Antworten (0)
Siehe auch
Kategorien
Mehr zu Modeling and Prediction with NARX and Time-Delay Networks finden Sie in Help Center und File Exchange
Produkte
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!