i have question in P&O
10 Ansichten (letzte 30 Tage)
Ältere Kommentare anzeigen
dear sir i have design four panels two series and 2 parallel array of pv and want to apply mppt with buck boost convertor the panel have vmax =54.7 and vo on load give -48 so when design buck boost as the load requried the load consumed power 1300 and l=(1-d)^2*R/2f d=dutycycle and cmin=vod/vrfR i try to change the ferquncey but there is mistake can any body help me please??