How to change scheduling policy in Downlink OFDMA simulation example https://www.mathworks.com/help/wlan/ug/802-11ax-downlink-ofdma-multinode-system-level-simulation.html
6 Ansichten (letzte 30 Tage)
Ältere Kommentare anzeigen
ATHANASIOS SPYRIDON
am 3 Nov. 2024
Bearbeitet: praguna manvi
am 7 Nov. 2024
I want to change and create a new scheduling policy in the above example https://www.mathworks.com/help/wlan/ug/802-11ax-downlink-ofdma-multinode-system-level-simulation.html but configureScheduler is for the 5g toolbox and does not work and i get the same results.
Thanks for your time.
0 Kommentare
Akzeptierte Antwort
praguna manvi
am 7 Nov. 2024
Bearbeitet: praguna manvi
am 7 Nov. 2024
It looks like you're interested in adding a new scheduling strategy for "WLAN" nodes. The example mentions using a round-robin approach to select "STAs" for each transmission. Unlike the "configureScheduler" function for "gnB" nodes in 5G, there isn't explicit support for scheduling on "WLAN" nodes. However, you can achieve the desired effect by changing the "position" property of a "WLAN" node based on your custom strategy.
For "WLAN" nodes, you can also implement random waypoint mobility, which allows a node to pause before moving to the next node using the "addMobility" function. You can find more information here:
Additionally, for more details on available object functions and properties for "WLAN" nodes, refer to the following link:
0 Kommentare
Weitere Antworten (0)
Siehe auch
Kategorien
Mehr zu WLAN Toolbox finden Sie in Help Center und File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!