bsxfun vs for loop. Code Optimization.
Ältere Kommentare anzeigen
Hello everyone.
I'm trying to optimize some code that is running in a for loop. The code is the following:
for k=...
n=20;
u = rand(4386,21,n);
v = rand(size(u(:,:,1)));
F = zeros(size(u,1),n);
for m=1:n
F(:,m) = squeeze(max(u(:,:,m).*v,[],2));
end
output(k) = function(F);
end
I've tried replacing the inner for loop by bsxfun , this way:
for k=...
n=20;
u = rand(4386,21,n);
v = rand(size(u(:,:,1)));
F = squeeze(max(bsxfun(@times,u,v),[],2));
output(k) = function(F);
end
But bsxfun is taking more time than the previous solution.
Why is that happening?
Any other ideas to optimize this code?
I'm working with the specified dimensions, and the bottleneck of the problem is located in the creation of array F .
Thanks in advance.
Dani
Akzeptierte Antwort
Weitere Antworten (0)
Kategorien
Mehr zu Windows finden Sie in Hilfe-Center und File Exchange
Produkte
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!