photo

Dusko Vujadinovic


Last seen: fast 2 Jahre vor Aktiv seit 2021

Followers: 0   Following: 0

Statistik

  • Thankful Level 2
  • Thankful Level 1

Abzeichen anzeigen

Feeds

Anzeigen nach

Frage


Manual MEX vs MEX by codegen
Hi, The instructions how to write a MEX file look easy: https://uk.mathworks.com/help/matlab/matlab_external/standalone-example...

fast 2 Jahre vor | 1 Antwort | 0

1

Antwort

Beantwortet
How to make Matlab MEX application to be real time one on SMP general purpose multicore platform
Hi Mikhail, Thanks for trying to help. I should had narrowed the scope of the question - to prevent that the discussion goes...

mehr als 2 Jahre vor | 0

Frage


How to make Matlab MEX application to be real time one on SMP general purpose multicore platform
Background: Developing, for example, a wireless modem is a complex multi skill know-how set. It starts from creating algorithms...

mehr als 2 Jahre vor | 2 Antworten | 0

2

Antworten

Frage


Why it is not possible to use breakpoints with parallel toolbox workers
Realisation that, it does not seem possible to use the breakpoints in applications using parallel toolbox workers https://uk.ma...

mehr als 2 Jahre vor | 1 Antwort | 0

1

Antwort

Frage


Codegen bug - infinite "while" loop generated in place of simple "for" loop
It looks that I encountered the codegen bug. I have a MEX application with multiple entries, i.e. I run the Matlab code as ske...

mehr als 2 Jahre vor | 1 Antwort | 1

1

Antwort

Frage


Matlab Coder - How to force generated code to keep Matlab functions prototypes
I generated the C code with Matlab Coder, but the generated code functions interfaces are not the same as the interfaces for app...

fast 3 Jahre vor | 0 Antworten | 1

0

Antworten

Frage


Building generated code for another - no Matlab machine
I successfuly generated and built the C code on Mac, where my Matlab (Coder) license is, but when trying to build for the taget ...

fast 3 Jahre vor | 1 Antwort | 0

1

Antwort

Frage


parallel computing toolbox - how to directly talk to the Workers?
I see for example that the Batch/Workers concept allows to sumbit the jobs to the scheduler which, in turn, schedules the jobs t...

etwa 3 Jahre vor | 1 Antwort | 0

1

Antwort