Filter löschen
Filter löschen

Is it necessary to perform a load flow prior to run the power_3levelVSC file?

1 Ansicht (letzte 30 Tage)
Good afternoon, in this file a PWM converter is connected to a grid. My question is whether it is necessary or not to perform a load flow before simulating this file.
If not could you please suggest other cases where a previous load flow is required to set the values of the blocks? Thanks in advance!
Juan Cabeza
jaca1810eng@gmail.com
Research Gate: Juan Cabeza
Twitter: @jaca1810eng

Akzeptierte Antwort

Joel Van Sickel
Joel Van Sickel am 8 Jun. 2020
Hello Juan,
due to the power electronics involved and how they are modelled in this model, the load flow option would not work. Instead, this model was run to steady state, and those states were saved and then put in as initial conditions.
Here are some models that use load flow. Unfortunately, if your main goal is the power electronics simulation, this type of work flow won't be useful for you.
Regards,
Joel

Weitere Antworten (0)

Communitys

Weitere Antworten in  Power Electronics Control

Kategorien

Mehr zu Power and Energy Systems finden Sie in Help Center und File Exchange

Produkte


Version

R2020a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by