program runtime question

2 Ansichten (letzte 30 Tage)
darksideofthemoon101
darksideofthemoon101 am 6 Apr. 2011
Hi,
I have a program that (for what I've done so far) takes a long time to run (~4s per loop). In the final version of the code I will be performing hundreds of loops. Would it be quicker if I assigned parts of the code as functions, or would this actually increase the run time?
Thanks
Richard

Akzeptierte Antwort

Walter Roberson
Walter Roberson am 6 Apr. 2011
It is difficult to predict exactly how MATLAB will optimize code. Especially before 2010b, the details how how the code was written in the file could make a substantial difference. This is one of those "You'd have to try it and see" matters.
Have you used the profiler to track down the portion of your code that is taking a lot of time?
  1 Kommentar
darksideofthemoon101
darksideofthemoon101 am 6 Apr. 2011
No, I might try this. Thanks Walter (and everyone else on here), you guys are great!

Melden Sie sich an, um zu kommentieren.

Weitere Antworten (1)

Jason Ross
Jason Ross am 6 Apr. 2011
Have you looked into using functions from the Parallel Computing Toolbox (parfor, spmd, etc)?
Of course, not knowing your problem, you may have conditions that prevent the use of these functions.

Kategorien

Mehr zu Data Type Identification finden Sie in Help Center und File Exchange

Tags

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by