Tolerance criteria for cost function obtained with PSO
2 Ansichten (letzte 30 Tage)
Ältere Kommentare anzeigen
Hi,
I have applied PSO for minimization of RMS value that is my cost function. I have used 150 iterations. How can I set up a tolerance criteria (e.g. 10^-12) for the cost function? So I want to run PSO until I get the cost function close to 10^-12. I call the PSO function within the script and the function outputs the best position, best cost, and cost convergence for 150 iterations. Should I set the tolerance criteria inside the script like a for loop or something else? Any advice would be very helfpul. Thanks.
0 Kommentare
Antworten (1)
Walter Roberson
am 30 Nov. 2016
You can set FunctionTolerance in relative terms. You would want to set MaxIterations high.
Siehe auch
Kategorien
Mehr zu Particle Swarm finden Sie in Help Center und File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!