Filter löschen
Filter löschen

Flow chart runs only once ?

3 Ansichten (letzte 30 Tage)
Xiaohong shen
Xiaohong shen am 13 Jun. 2023
Newly I realized the flow chart in the state1 is excuted only one time at state entry. Actually I expected the cnt shall be counted up every loop as long as the state1 is active.
How can I fix it so that the flow chart is called every loop?
I found also the following note. It would mean the observed behavior is intended?
If a Stateflow chart contains only a flow chart, the chart evaluates the flow chart each time the chart wakes up. In contrast, the chart evaluates any flow chart inside a state only during state entry.

Antworten (0)

Kategorien

Mehr zu Simulink Functions finden Sie in Help Center und File Exchange

Produkte


Version

R2022a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by