Question about finding the optimal value _Problem based optimization

1 Ansicht (letzte 30 Tage)
NN
NN am 20 Sep. 2021
I have tried to plot the values of optimal solution (minimal cost in this problem)
When I used the command
options = optimoptions(prob.optimoptions,'Display','iter');
I am getting a big value of 8.97e10 $/hr as Fval(optimal solution).
Please check this and confirm if it is correct or not or since the problem using an optimized time vector(dt=300), Is it required to modify the fval we get at the end (8.97e10 $/hr.)?
Please let me know. I am attaching the modified files(battsolaropt) and the diagnostic viewer screen for your reference. It is written No feasible solution was found.
Also please let me know why a gain of (3600*100) is used for calculating cost in Simulink, Why 100 is there?
Kindly advice.

Antworten (0)

Kategorien

Mehr zu Problem-Based Optimization Setup finden Sie in Help Center und File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by