Terribly slow simulation // NN Predictive Controler.

7 Ansichten (letzte 30 Tage)
Mat
Mat am 10 Jan. 2014
Bearbeitet: Mat am 10 Jan. 2014
Hello.
I happen to have some problems with simulations of systems with NN Predictive Controler.
At first, I thought the XY Graph was a problem, but I removed it so I could write the data directly to the workspace from simulations using both NARMA-L2 controler and Predictive controler, and now simulations with NARMA-L2 are done instantly, while the ones with Predictive controler take more than 1 hour (!) for simulation time 50. What is wrong?
Looking forward to any help from you guys.

Antworten (0)

Kategorien

Mehr zu Model Predictive Control Toolbox finden Sie in Help Center und File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by