Is this the correct way to use "hold on" in a for loop?

55 Ansichten (letzte 30 Tage)
PASUNURU  SAI VINEETH
PASUNURU SAI VINEETH am 5 Aug. 2021
Kommentiert: Star Strider am 5 Aug. 2021
I am new to MATLAB and just trying to run a program for projection motion. I feel I am using the hold on and hold off in the correct way but I'm greeted with empty plot. Can someone please point out the mistake in the code?

Antworten (2)

Yongjian Feng
Yongjian Feng am 5 Aug. 2021
You only need to hold on for the first plot call, right?

Star Strider
Star Strider am 5 Aug. 2021
Is this the correct way to use "hold on" in a for loop?
That is not the way I would do it.
Try this instead:
figure
hold on
for t = 1:5
dx = ...
dy = ...
plot(dx, dy, 'g-')
end
hold off
grid
.
  2 Kommentare
PASUNURU  SAI VINEETH
PASUNURU SAI VINEETH am 5 Aug. 2021
I tried your way but it didn't result in the plot either. I was able to do it by eliminating for loop but can't find a way when I have to use it.
Star Strider
Star Strider am 5 Aug. 2021
I canot run images of code, only actual code, so I could not run what was posted.
If you are plotting points, do this instead, in the loop:
plot(x, y, 'p')
to plot the points as stars without connecting lines.
.

Melden Sie sich an, um zu kommentieren.

Kategorien

Mehr zu Graphics Performance finden Sie in Help Center und File Exchange

Tags

Produkte


Version

R2021a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by