how i do weekly average?

5 Ansichten (letzte 30 Tage)
Lilya
Lilya am 27 Sep. 2017
Bearbeitet: Tanziha Mahjabin am 6 Mär. 2020
Hi all,
I have a matrix of 978*744 which is = no. observation*hours in a month. and the attached mat file is the DateTime vector. I want to make a weekly average.
Thank you in advance.
  2 Kommentare
Jan
Jan am 27 Sep. 2017
The MAT file contains the datetime vector of what? I do not have access to a Matlab engine currently, therefore I cannot inspect the MAT file. Otherwise perhaps I could guess, what it contains. But maybe guessing is less efficient than if you explain it.
Lilya
Lilya am 28 Sep. 2017
thanks Jan for your response. The attached MAT file is the date time of the corresponding measurements (978*744) which also has the same dimension of the hours per month (1*744). Therefore, I want to calculate the weekly average of the measurement from the date time reference matrix (1*744) going throw the index of the two matrices.
I hope this helps to clarify my idea.
thank you

Melden Sie sich an, um zu kommentieren.

Akzeptierte Antwort

Andrei Bobrov
Andrei Bobrov am 28 Sep. 2017
Bearbeitet: Andrei Bobrov am 28 Sep. 2017
Let data - your array [978 x 744].
For MATLAB >= R2016b (here week -> [Sun : Sat]):
Time = (datetime([2017 7 1 0 0 0]):hours(1):datetime([2017 7 31 23 0 0]))';
% or: Time = datetime(timeCopy);
TT = array2timetable(data','R',Time);
TT_out = retime(TT,'weekly','mean');
For MATLAB < R2016b ( here week -> [Mon : Sun]):
data = data';
Time = (datetime([2017 7 1 0 0 0]):hours(1):datetime([2017 7 31 23 0 0]))';
wd = rem(weekday(Time) + 5, 7) + 1;
ii = [true;diff(wd == 1) == 1];
g = cumsum(ii);
[r,c] = ndgrid(g,1:size(TT,2));
TT_out = [table(Time(ii),'V',{'Time'}),...
array2table(accumarray([r(:),c(:)],data(:),[],@mean))];
  2 Kommentare
Lilya
Lilya am 29 Sep. 2017
:') Thanks so much.
Tanziha Mahjabin
Tanziha Mahjabin am 3 Mär. 2020
Bearbeitet: Tanziha Mahjabin am 6 Mär. 2020
Hi,
what about the array with 3 dimensions? I have daily average of SST data (340X285X36) which are (lon,lat,time). I want to have weekly average.
Is the [r,c] line correct? Then how can i mean it? And if possible how can i modify the 'for loop'?So far i have this:
clear all; close all; clc;
path(path,'D:\Radar_job\SST')
ncfile='IMOS_aggregation_20200212T151211Z.nc'; %short time
time2=ncread(ncfile,'time');
time2=ncread(ncfile,'time')./86400+datenum(1981,01,01);
SST_lon=ncread(ncfile,'lon');
SST_lat=ncread(ncfile,'lat');
SST=ncread(ncfile,'sea_surface_temperature');
SST=SST-273.15;
id1=find(SST_lat>-39.9&SST_lat<-36.2);
id2=find(SST_lon>137.1&SST_lon<141.9);
lat1=SST_lat(id1);
lon1=SST_lon(id2);
tvec=datevec(time2);
t=datetime(tvec)
[C,uq,iuq]=unique((tvec(:,1:3)),'rows','stable'); %manually look which rows are full weeks
time3=datenum(C);
wd = rem(weekday(time3) + 5, 7) + 1;
ii = [true;diff(wd == 1) == 1];
g = cumsum(ii);
[r,c] = ndgrid(g,1:size(SST,3));
for i=1:length(time3)
h=figure;
set(gcf,'Position',[200 100 1500 800])
set(gcf,'PaperPositionMode','auto')
m_proj('mercator','lon<gitude>',[137.1 141.9],'lat<itude>',[-39.9 -36.2]);
m_pcolor(lon1,lat1,(SST(id2,id1,i))');
shading interp;
m_proj('mercator','lon<gitude>',[137.1 141.9],'lat<itude>',[-39.9 -36.2]);
m_gshhs_h('patch',[0.7 0.7 0.7],'LineWidth',1.5);
m_grid('ytick',[-90:0.5:90],'xtick',[-180:0.5:180],'tickdir','in','FontSize',14);
colormap jet
colorbar
caxis manual
caxis([15 19])
end

Melden Sie sich an, um zu kommentieren.

Weitere Antworten (0)

Kategorien

Mehr zu MATLAB finden Sie in Help Center und File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by