This is machine translation

Translated by Microsoft
Mouseover text to see original. Click the button below to return to the English version of the page.

Note: This page has been translated by MathWorks. Click here to see
To view all translated materials including this page, select Country from the country navigator on the bottom of this page.

db_0133: Use of patterns for flow charts

ID: Title

db_0133: Use of patterns for flow charts

Priority

Strongly recommended

Scope

MAAB

MATLAB Versions

All

Prerequisites

None

Description

A flow chart is built with the help of flow chart patterns (for example, if-then-else, for loop, and so on):

  • The data flow is oriented from the top to the bottom.

  • Patterns are connected with empty transitions.

Rationale

  • Readability

Last Changed

V2.2

Model Advisor Check

Not applicable

Introduced in R2010a